PROJECT DETAILS
Rightway was asked to detail, fabricate, coat, and install both entrance structural steel frames within a 4 week period. The teams worked nights and weekends to accomplish the task, and completed on time. The frames included heavy structural columns, beams, and several full pen welds at each of the cross brace locations.